Here are some photos of the steps we took in performing the renovation to the right of 16 tee and along the pond edge of 17.
Excavator plucking out stumps from the trees we cut down.
Use of a skid-steer to do any grading prior to laying down sod.
Excavator prepping the pond edge for sod.
Installation of Enkamat to help hold the sod in position along the pond edge.
Sod installation. The sod was pinned into the bank providing stability.
Picture from 17 fairway after all of the sod was installed.